New Construction2026-09-18T18:12:13-04:00

Electrical Services

New Construction Electrical

SEI handles the complete electrical scope for new home construction across the Hamptons and the East End, from the first set of architectural drawings through the final walkthrough. We work directly with builders, architects, and homeowners so the electrical plan for a house gets figured out early, while it still can be.

Electrical Layouts Planned Around How You’ll Live in the Home

Before the first wire is run, we walk the home with the homeowner and builder to understand how each space will actually be used. Where will the TV go? Should the lighting be separated to reduce glare? Would additional outlets make the room more functional? These conversations help us anticipate the details and build them into the electrical plan from the start—before the walls are closed and the decisions become permanent.

What We Handle

  • Service entrance and utility coordination

  • Rough wiring for the entire home

  • Mechanical and HVAC electrical hookups

  • Device trim out
  • Decorative fixture installation
  • Panel labeling and documentation
  • Electrical permits and inspections
  • Final testing, commissioning, and client walkthrough

Our New Construction Electrical Process

  • Bidding and planning. We review the drawings, price the scope, and like to be brought in while the architect is still finalizing plans. Getting involved early means we can weigh in on how the house will actually be lived in, not just how it’s drawn.

  • Pre-construction walkthrough. Before we run a single wire, we lay out the entire house in spray paint on the subfloor: every switch, outlet, and light location marked so the homeowner can walk each room and see it before it’s built into the walls. Want to move a switch, add outlets, or rethink a lighting layout? This is when we make that change, not after the drywall goes up.

  • Rough wiring and utilities. With the layout approved, we bring the electrical service into the house, run the utilities, and start rough wiring alongside the rest of the build.

  • Mechanical hookups. While the house is being insulated and sheetrocked, we’re handling HVAC hookups and other mechanical wiring, staying on site so nothing slows the schedule.

  • Trim and fixtures. Once paint and millwork are finished, we install devices, then move to fixture installation and lighting.

  • Testing and closeout. Every system gets tested and commissioned before we hand off the house. We label the panels, document the work, and walk the homeowner and builder through everything, so anyone who opens that panel five, ten, or twenty years from now knows exactly what they’re looking at.

Rough electrical wiring in a new Hamptons home
New construction lighting installed by SEI
Electrical run to an outdoor yard installation

Electrical and Home Automation Planned Together

When we’re brought in early, we plan the electrical and the low voltage or home automation work together, using the same crews and the same site knowledge. That means fewer trades stepping over each other, fewer scheduling conflicts, and one point of contact if something needs attention after move in.

It also means we can plan ahead for technology that hasn’t hit the market yet. Most new builds now get Cat 6 wiring as standard, since it’s what’s needed to support Wi-Fi 7, plus conduit runs to the yard for future landscape lighting and a path to the attic in case someone wants a Starlink connection down the road.

Products We Trust

We install Leviton panels, chosen for being some of the most serviceable, installer friendly panels on the market.

Leviton logo, installed by SEI

Technology That Enhances Every Moment

Frequently Asked Questions

Do you wire homes for technology that doesn’t exist yet?2026-08-20T20:12:40-04:00

We run Cat 6 as standard and add conduit for things like future landscape lighting or a Starlink dish, so the house is ready when you are, without opening up finished walls.

What if we want to make changes after the walkthrough?2026-08-20T20:12:07-04:00

We build in a walkthrough specifically so you can make changes before the walls close up. If something comes up later, we’ll explain what’s involved, keep any patchwork to a minimum, and give you a clear number before we start.

Will you also wire our house for smart home and automation systems?2026-08-20T20:09:03-04:00

Yes. We handle electrical and automation under one roof, which means we plan both together from the start instead of coordinating between two separate contractors.

Do you handle electrical permits?2026-08-20T20:08:30-04:00

Yes. We file the electrical permits for the project and coordinate with the utility company to get service set up.

When should we bring SEI into a new construction project?2026-08-20T20:07:57-04:00

As early as possible, ideally once an architect is on board and there are basic drawings to work from. Getting involved at the design stage means we can weigh in on layout, panel locations, and technology before decisions get expensive to change.

Building a new home on the East End? Let’s talk through the electrical plan.