Electrical Services
New Construction Electrical
SEI handles the complete electrical scope for new home construction across the Hamptons and the East End, from the first set of architectural drawings through the final walkthrough. We work directly with builders, architects, and homeowners so the electrical plan for a house gets figured out early, while it still can be.
Electrical Layouts Planned Around How You’ll Live in the Home
Before the first wire is run, we walk the home with the homeowner and builder to understand how each space will actually be used. Where will the TV go? Should the lighting be separated to reduce glare? Would additional outlets make the room more functional? These conversations help us anticipate the details and build them into the electrical plan from the start—before the walls are closed and the decisions become permanent.
Our New Construction Electrical Process



Electrical and Home Automation Planned Together
When we’re brought in early, we plan the electrical and the low voltage or home automation work together, using the same crews and the same site knowledge. That means fewer trades stepping over each other, fewer scheduling conflicts, and one point of contact if something needs attention after move in.
It also means we can plan ahead for technology that hasn’t hit the market yet. Most new builds now get Cat 6 wiring as standard, since it’s what’s needed to support Wi-Fi 7, plus conduit runs to the yard for future landscape lighting and a path to the attic in case someone wants a Starlink connection down the road.
Products We Trust
We install Leviton panels, chosen for being some of the most serviceable, installer friendly panels on the market.

Frequently Asked Questions
We run Cat 6 as standard and add conduit for things like future landscape lighting or a Starlink dish, so the house is ready when you are, without opening up finished walls.
We build in a walkthrough specifically so you can make changes before the walls close up. If something comes up later, we’ll explain what’s involved, keep any patchwork to a minimum, and give you a clear number before we start.
Yes. We handle electrical and automation under one roof, which means we plan both together from the start instead of coordinating between two separate contractors.
Yes. We file the electrical permits for the project and coordinate with the utility company to get service set up.
As early as possible, ideally once an architect is on board and there are basic drawings to work from. Getting involved at the design stage means we can weigh in on layout, panel locations, and technology before decisions get expensive to change.